The SP9 Gargnano-Valvestino will reopen without time restrictions starting Wednesday, December 18. As of 5:00 PM today, the section will be fully accessible after a period of partial closure, during which the road was only passable in alternating one-way traffic regulated by traffic lights at specific times. During the construction operations, some restrictions will apply, including a reduced speed limit of 30 km/h and bans on heavy vehicles over 7.5 tons.
In the future, when weather conditions permit, a new intervention is planned that will involve a temporary road closure to complete the work. Possible time slots will be evaluated to ensure safe passage during this final phase. Updates on the situation will be promptly communicated by the relevant authorities.